Mass Concrete Underpinning
Tuesday, February 16, 2010 at 09:31AM We were instructed by the client's Engineer to carry out Traditional or Mass Concrete Underpinning to the right hand wall to arrest ongoing settlement of these walls..
Tuesday, February 16, 2010 at 09:31AM We were instructed by the client's Engineer to carry out Traditional or Mass Concrete Underpinning to the right hand wall to arrest ongoing settlement of these walls..
Tuesday, February 16, 2010 at 09:16AM Amberleigh Road, Chorleywood A project where we constructed a large addition to a substantial family home from inception through to completion under the design and guidance of Simon Levy Associates. It is worthy of note that this project was completed on time and budget and to very high and exacting standards as required by the client.
Tuesday, February 16, 2010 at 04:59AM On this project our client, a local developer, wanted to form a basement for two new semi-detached residential properties..
Tuesday, February 16, 2010 at 04:56AM This property was built in the 1930's and had suffered significant subsidence due to a drainage failure coupled with large trees in close proximity, within the rear garden.
Wednesday, January 27, 2010 at 05:31AM We were consulted as to the feasibility of constructing a basement beneath an existing car park for the installation of an electric car lift, and subsequently to form the foundations and ground floor of a residential house.
Wednesday, January 27, 2010 at 05:29AM This traditionally constructed property in North London was repaired as part of a subsidence claim using a combination of Helifix crack stitch bars and Cemties to stitch the masonry cracks.